Operating procedures for edge banding machines
Firstly, by standardizing the operating procedures, ensure that the edge sealing work meets quality requirements and avoid losses and accidents caused by non-standard operations.
Secondly, scope of application
Edge banding machine
Thirdly, homework preparation
1. Clean the machine and workplace.
2. Check if the glue in the glue tank is sufficient, and if it is insufficient, add glue appropriately according to the amount used.
3. According to the length of the workpiece, adjust the position of the balance bar.
4. Adjust the distance between the upper pressing shaft and the lower track according to the thickness of the workpiece. Ensure that the workpiece can be pressed stably without damaging the surface of the workpiece due to being too tight.
5. Adjust the steel sheet of the edge sealing strip to ensure that the adhesive coating on the edge sealing strip is uniform and sufficient.
6. Test the machine to see if the edge banding machine is operating normally.
7. Prepare materials and accessories.
Fourth, homework procedures
1. Heat the glue pot to 180 degrees and turn on other switches when the indicator light is on. When sealing the edges, the temperature of the glue pot should be around 180 degrees plus or minus 20 degrees, and the glue axis should be around 200 degrees plus or minus 20 degrees.
2. Install the edge banding strip, place the workpiece on the conveyor belt, close to the guide rail baffle, and then push it in parallel and evenly.
3. For each type of workpiece processed, the first piece must undergo self inspection.
4. The material receiving personnel should sweep away the dust before stacking.
5. After the operation is completed, cut off the power supply and clean the site.
Fifth, precautions
1. Operators are strictly prohibited from wearing loose clothing, gloves, and long hair must be curled up.
2. It is strictly prohibited to put your hands under the conveyor belt when feeding.
3. The thickness of the edge sealing plate should be between 9-60mm.
4. When there is an abnormality in the machine, immediately press the emergency stop switch or cut off the power supply.
5. After the work is completed, it is necessary to cut off the power supply, clean the equipment and the site.